Implementation of the Critical Path Method (CPM) in the Flower House Construction Project

Authors

  • Galang Pramuja
  • Dimas Aditya Universitas Potensi Utama
  • Ahmad Ridwan Universitas Potensi Utama
  • Anggi BR Pasaribu Universitas Potensi Utama
  • Rahmat Hidayat Universitas Potensi Utama
  • Lamhot Pasaribuf Universitas Potensi Utama
  • Vidi Agung Fragastia Universitas Potensi Utama

Keywords:

CPM, Network Diagram, Critical Path, Flower House Construction, Project Management

Abstract

The project management approach plays an important role in controlling project activities carried out to minimize time and cost risks. Project management is usually used in construction projects such as general development to research and development activities. One crucial aspect in project management is scheduling the implementation time. Scheduling serves to determine the sequence, duration, and relationship between project activities. This research writing uses a quantitative research design by collecting primary and secondary data relevant to the research questions. This research also uses the Critical Path Method (CPM) approach, which is a method used to analyze project scheduling and project time planning as well as find critical paths to determine effective and optimal time in completing a project. This research was conducted on the Flower House Construction project at PT. XYZ. The results of this study indicate that the critical path obtained is as many as 6 activities or jobs, namely, (A) Measurement and installation of bowplanks, (B) Making and assembling iron poles, (D) Installation of iron poles, (E) Installation of stones for walls, (F) Plastering walls, (H) Painting and finishing. The critical path obtained from start to finish is 1 – 2 – 3 – 5 – 6 – 7 – 9.

References

[1] Angelin, A., & Ariyanti, S. (2018). ANALYSIS OF NEW PRODUCT DEVELOPMENT PROJECT SCHEDULING USING PERT AND CPM METHODS. Scientific Journal of Industrial Engineering , 6 (1). https://doi.org/10.24912/JITIUNTAR.V6I1.3025

[2] Arianie, GP, & Puspitasari, NB (2017). PROJECT MANAGEMENT PLANNING TO IMPROVE COMPANY RESOURCE EFFICIENCY AND EFFECTIVENESS (Case Study: Qiscus Pte Ltd). J@ti Undip: Journal of Industrial Engineering , 12 (3), 189–196. https://doi.org/10.14710/JATI.12.3.189-196

[3] Cahyadi, TA, Widodo, LE, Syihab, Z., & Notosiswoyo, S. (2017). The Effect of Drain Hole Installation on Groundwater Level Subsidence in Different Permeability Media (Conceptual Model Case Study) . https://doi.org/10.31227/OSF.IO/ZNSGH

[4] Iwawo, ERM, Tjakra, J., & Pratasis, PAK (2016). APPLICATION OF CPM METHOD IN CONSTRUCTION PROJECTS (CASE STUDY OF NEW BUILDING CONSTRUCTION OF EBEN HAEZAR MANADO COMPLEX). Journal of Civil Statics , 4 (9), 551–558.

[5] Lapangan, R., Dalam, M., Kembali, M., Terbuka, R., Demi, H., Ekologi, K., Kota, D., Febriana, M., Harahap, PP, Dhani, R., Sinaga, F., Trisna, WA, Ivanna, J., Jaya, I., Pancasila, P., & Kewarganegaraan, D. (2025). Revitalization of Merdeka Square in Reviving Green Open Space for Ecological Sustainability in Medan City. Tambusai Education Journal , 9 (1), 1109–1112. https://jptam.org/index.php/jptam/article/view/24342

[6] Lokajaya, IN (2018). Analysis of Time and Cost Control in Road Improvement Projects Using the Pert Method. Sinteks: Jurnal Teknik , 8 (2), 57–65. https://doi.org/10.0001/113

[7] Nugraha, AS, & Sumarman, S. (2017). CONSTRUCTION MANAGEMENT ANALYSIS OF THE DEVELOPMENT OF THE SAMSAT OFFICE SERVICE BRANCH OF THE PROVINCIAL IN THE MAJALENGKA REGION, MAJALENGKA REGENCY. Journal of Construction and Infrastructure , 6 (3), 239. https://doi.org/10.33603/JKI.V6I3.3843

[8] Rahsa Pramesti, H., Budi Listyawan, A., Yani Tromol, JA, & Tengah, J. (2023). Time Control Analysis Using the Critical Path Method (CPM) on the Iqro' Islamic Boarding School Construction Project, Surakarta. Proceedings of the UMS National Civil Engineering Seminar , 560–566. https://proceedings.ums.ac.id/sipil/article/view/2762

[9] Renwarin, P., Negeri, P., Octovianus, A., Politeknik, J., Ambon Vector, N., & Hutubessy, RR (2025). Scheduling Analysis Using CPM and Line of Balance Methods in the Development of the Citraland Ambon Housing Project. MULTIDISCIPLINARY JOURNAL OF ACADEMIC SCIENCES , 2 (1), 696–709. https://doi.org/10.61722/JMIA.V2I1.4008

[10] After Failing 4 Times, Construction of the Titi Dua Sicanang Bridge Has Been Completed . (nd). Retrieved July 20, 2025, from https://regional.kompas.com/read/2024/08/23/131401378/sempat-gagal-4-kali-pembangunan-jembatan-titi-dua-sicanang-dituntaskan?utm_source=chatgpt.com

[11] Septiawan, D. (2020). Analysis of the Application of the Critical Path Method in the Mosque Furniture Procurement Project at Jepera Inti Kreasindo. SIJIE Scientific Journal of Industrial Engineering , 1 (2), 23–27. https://doi.org/10.30998/.V1I2.70

[12] Setiawati, S., & Rezky Ariessa Dewi, and. (nd). Application of CPM and PERT Methods in Construction Project Scheduling (Case Study: Rehabilitation/Repair and Improvement of Cross-District/City Irrigation Infrastructure in Pekan Dolok) .

[13] SHOLAHUDDIN, M., & Octavia, YN (2024). APPLICATION OF CRITICAL PATH METHOD (CPM) IN ROAD RECONSTRUCTION PROJECTS TO IDENTIFY CRITICAL PATH WORK ACTIVITIES. DEARSIP: Journal of Architecture and Civil , 4 (02), 72–84. https://doi.org/10.52166/DEARSIP.V4I02.7822

[14] Analysis of Project Scheduling Using the CPM Method (Case Study of Prayer Room Construction in PT. Journal of Civil Engineering and Planning (JCEP) , 5 (1), 16–24. https://doi.org/10.37253/JCEP.V5I1.9206

[15] Wibowo, P., & Rozy, N. (2020). CONSTRUCTION MANAGEMENT ANALYSIS OF THE CONSTRUCTION OF THE CLASS III INPATIENT BUILDING OF WALED REGIONAL HOSPITAL, CIREBON REGENCY. Journal of Construction and Infrastructure , 9 (2), 2085–8744. https://doi.org/10.33603/JKI.V9I2.3928

Downloads

Published

2025-08-01