Analysis of Tapioca Flour Production Process Control at PT. Florindo Makmur
Keywords:
Linear regression, t-Test, Determination Coefficient Test (R2), Tapioca Flour, Process ControlAbstract
There are obstacles in the tapioca flour processing process at PT. Florindo Makmur, namely production capacity has not been utilized properly because the supply of raw materials and the public's interest in planting cassava affects tapioca production. The smoothness of the production process will not run smoothly if the control of raw materials does not match customer demand, therefore controlling raw material inventory is very important for the company. In order to meet the uncertainty of consumer orders. One step that can be taken so that smooth production continues to run optimally is to design good and correct raw material inventory control. Therefore, based on the considerations above, it is hoped that the company can build cooperation with suppliers. From this problem, the researcher conducted a problem analysis to predict whether the supply of cassava raw materials at PT. Florindo Makmur has a positive effect on its production process. To solve the existing problem, the following calculation analysis is needed: Linear regression method analysis, Partial Hypothesis Test (t-Test), Determination Coefficient Test (R2). Based on the research that has been conducted on the analysis of the problem to determine the effect of cassava raw material inventory on the tapioca flour production process at PT. Florindo Makmur, the following conclusions can be drawn: The results of the linear regression calculation in 2023 obtained a value of Y = -31.707 + 0.261X and in 2024 obtained a value of Y = -165.529 + 0.274X. The results of the partial calculation (t-test) in 2023 obtained a t-count value of 87,072 and in 2024 obtained a t-count value of 58,148. The results of the calculation of the coefficient of determination (R2) in 2023 were 99.9% and in 2024 were 99.7%. Based on the results of this study, PT. Florindo Makmur is expected to be able to determine the amount of safety stock that must be in the warehouse to anticipate a shortage of cassava raw materials and result in the production process being stopped for 1 or 2 days. PT. Florindo Makmur should work together with farmers to provide training on good cassava planting issues so as to provide good harvest results. This can maintain the availability of raw materials and the sustainability of the production process of PT. Florindo Makmur
References
[1] Widad, N. N. (2020). Analisis Pengendalian Bahan Baku Ubi Kayu Pada Agroindustri Tepung Tapioka di PT. Sari Bumi Karya, Kabupaten Purbalingga.
[2] Alawiyah, D., & Susetyo, D. P. (2021). Pengaruh pengendalian proses produksi dan output produksi terhadap bonus pada pt glostrtar indonesia i. Jurnal Mahasiswa Akuntansi, 2(1), 169-188.
[3] NR, I. R. (2012). Perancangan Keseimbangan Lintasan Produksi untuk Mengurangi Balance Delay dan Meningkatkan Efisiensi Kerja. Performa: Media Ilmiah Teknik Industri, 11(2). Pp. 75-84.
[4] Anista, T., & Widiyastuti, T. (2016). Analisis pengelolaan persediaan bahan baku untuk meningkatkan produksi guna memenuhi permintaan konsumen pada UD Nanda Putri Srengat Blitar. Jurnal Penelitian Manajemen Terapan (PENATARAN), 1(1), 92-103.
[5] Pambudy, A. P. (2017). Pengaruh Pengendalian Produksi Terhadap Kegagalan Produk Songkok Pada Ud. Cahaya Bintang Pandantoyo Kalitengah Kabupaten Lamongan. Jurnal Ekbis, 17(1), 12-Halaman.
[6] Sagala, E. (2017). Manajemen panen dan pasca panen ubi kayu (Manihot esculenta Crantz) untuk bahan baku industri tapioka di Lampung. Buletin Agrohorti, 5(3), 400-409.
[7] Tauva, K. A., & Chamidah, S. (2022). Analisis Pengendalian Bahan Baku Tepung Tapioka Menggunakan Metode Economic Order Quantity (EOQ) Pada PT. Budi Starch & Sweetener, TBK. Bussman Journal: Indonesian Journal of Business and Management, 2(3), 574-590.
[8] Ababil, O. J., Wibowo, S. A., & Zahro, H. Z. (2022). Penerapan metode regresi linier dalam prediksi penjualan liquid vape di toko vapor pandaan berbasis website. JATI (Jurnal Mahasiswa Teknik Informatika), 6(1), 186-195.
[9] Rudi, W. S., Pranoto, Y. A., & Ariwibisono, F. X. (2023). Penerapan Metode Regresi Linier Dalam Peramalan Penjualan Kue Di Toko Karya Bahari Samarinda Berbasis Website. JATI (Jurnal Mahasiswa Teknik Informatika), 7(4), 2451-2457.
[10] Prasetyo, A. H. T. (2019). BAB III Metode Penelitian - Repository STEI, P. 40.
[11] Tahitu, A., Tutuhatunewa, A. R., & Fadirubun, V. M. (2024). Pengaruh komunikasi organisasi terhadap gaya kepemimpinan lurah milenial di Kota Ambon. Jurnal Badati, 6(1), 53-72.
[12] Ghozali, I. (2016). Multivariate Analysis Application with IBM SPSS 23 Program (8th ed.). Semarang: Diponegoro University Publishing Agency.
[13] Gujarati, D. N., & Porter, D. C. (2009). Basic Econometrics (5th ed.). McGraw-Hill Education.
[14] Kusuma, E. W., Widjaya, S., & Situmorang, S. (2020). Analisis pengadaan bahan baku dan nilai tambah agroindustri keripik ubi kayu di Kecamatan Way Jepara Kabupaten Lampung Timur. Jurnal Ilmu Ilmu Agribisnis: Journal of Agribusiness Science, 8(1), 70-77.
[15] Mustafa, A. (2015). Analisis proses pembuatan pati ubi kayu (tapioka) berbasis neraca massa. Agrointek: Jurnal Teknologi Industri Pertanian, 9(2), 118-124.
[16] Sagala, E. (2017). Manajemen panen dan pasca panen ubi kayu (Manihot esculenta Crantz) untuk bahan baku industri tapioka di Lampung. Buletin Agrohorti, 5(3), 400-409.
[17] Baihaqi, B., Windayani, W., & Bahar, H. (2024). Analisis Nilai Tambah Pengolahan Ubi Kayu (Manihot esculenta) menjadi Keripik Ubi kayu. Jurnal Teknologi Pengolahan Pertanian, 6(1), 5-11.
[18] Egboduku, W. O., Egboduku, T., Golohor, O. M., Imarhiagbe, O., & Ogwu, M. C. (2024). Cassava as raw material for sustainable bioeconomy development. In Sustainable Cassava (pp. 57-73). Academic Press.
[19] Hardoyo, H., Safrudin, A., & Komara, A. (2013). The supply chain system of cassava on the tapioca industry. In 2nd International Conference on Engineering and Technology Development 2013. Bandar Lampung University.
[20] Suryaningrat, I. B., Amilia, W., & Choiron, M. (2015). Current condition of agroindustrial supply chain of cassava products: a case survey of East Java, Indonesia. Agriculture and Agricultural Science Procedia, 3, 137-142.
[21] Polewangi, Y. D. (2020). Analysis of Supplier Ability in Providing Raw Materials Cassava and Planning the Amount and Time of Arrival Raw Materials at PT. ABC. Budapest International Research in Exact Sciences (BirEx) Journal, 2(3), 382-388.
[22] O'Brien, G. M., Jones, D. M., Wheatley, C. C., & Sanchez, T. (1994, March). Processing approaches to optimising raw materials and end product quality in the production of cassava flours. In International Workshop on Cassava Safety 375 (pp. 183-192).
[23] Jakrawatana, N., Pingmuangleka, P., & Gheewala, S. H. (2016). Material flow management and cleaner production of cassava processing for future food, feed and fuel in Thailand. Journal of Cleaner Production, 134, 633-641.
[24] Li, S., Cui, Y., Zhou, Y., Luo, Z., Liu, J., & Zhao, M. (2017). The industrial applications of cassava: current status, opportunities and prospects. Journal of the Science of Food and Agriculture, 97(8), 2282-2290.
[25] Fu, H., Qu, Y., & Pan, Y. (2018). Efficiency of cassava production in China: Empirical analysis of field surveys from six provinces. Applied Sciences, 8(8), 1356.
[26] Darko-Koomson, S., Aidoo, R., & Abdoulaye, T. (2020). Analysis of cassava value chain in Ghana: implications for upgrading smallholder supply systems. Journal of Agribusiness in Developing and Emerging Economies, 10(2), 217-235.
[27] Ghozali, I. (2016). Aplikasi Analisis Multivariate dengan Program IBM SPSS 23 (8th ed.). Semarang: Badan Penerbit Universitas Diponegoro.
[28] Heizer, J., & Render, B. (2014). Operations Management (11th ed.). Pearson Education.
[29] Stevenson, W. J. (2011). Operations Management (11th ed.). McGraw-Hill Education.